Building permit application
Home
Your government
Building permit application
Building permit application form
To apply, please fill out the information below.
Please ensure that all required documents are ready for submission.
Incomplete applications are not saved for future submission.
Resources
permit application checklist
detailing document information requirements.
building permit application form
(download first then fill out and sign)
owner's authorization form
(download first then fill out and sign)
Energy STEPCODE Compliance Reports
If you require assistance with your payment call 250-469-6211 or email
inspection@rdco.com
Allowed file types are
pdf
documents.
Permit & contact information
Permit type:
*
--- Select permit type ---
Note:
Permit application fee is
based on project amount
Project value:
*
Project purpose:
Property Identification Number (PID):
*
Building site street address:
Building site city:
Building site postal code:
Applicant full name (owner or agent):
*
Applicant address:
*
(same as project address:)
Project files and documentation upload
The following documents are required as part of your application.
Download pdfs from above and fill in required information.
Building permit application form:
*
Scaled architectural drawings and site plan:
*
Energy efficiency specifications (including pre-construction compliance report):
*
Septic approval (if applicable):
Water letter from irrigation district (proof of potable water
required
if the property is not part of an RDCO water system):
Roof truss package & beam layouts & designs (solar ready):
*
Manufactures drawings:
Blocking plan and footing/foundation schedule:
Geotechnical & structural engineer’s designs (Schedules B, D & proof of insurance
required
if applicable):
Location, material and design of fence:
*
Location of septic field and pool equipment:
*
Pool plans:
*
GeotechnicalReport:
*
Retaining wall plans (include material and height):
*
Engineering drawings if wall is greater than 1.5m:
*
Wood stove manufacturer specifications, wood stove to be CSA approved:
*
Owner’s authorization (
required
if working on behalf of owner):
Certificate of Title (6 months):
*
Title covenants, easements and right-of-ways:
Wildfire Covenant registered on Title (if applicable):
HPO – Homeowner Protections Act Documentation:
*
Billing & payment information
Phone number
*
Email
*
Street address
*
City
*
Postal Code
*
I agree to RDCO's data collection policy.
*
Your building permit application was successfully submitted.
What to expect next:
You will receive an email confirmation of your building permit application.
We will set a priority and begin to review your submission and accuracy of files.
If you have questions you can reference your BP application number above and email inspection@rdco.com or call 250-469-6211.
Correspondence will be made to email provided for additional files and payment of final permit.
Back to Top
Processing permit application
×
Processing, please wait ...